Cable Routing Plan

Simplified floor plan overlay showing cable routes, conduit sizes, and acoustic wall penetration points. All penetrations into acoustic walls must be sealed after cable pull and remain coordinated with the penetration details page [AC].

Route Types
Audio / power / data / video / control
Critical Penetrations
W6 only [AC]
Reference Height
90 cm AFF SB-01 / local floor boxes
Routing Zone
Buffer spine + ceiling void
Audio snake Power / electrical Data Cat6A HDMI / video Control / tally

Floor Plan Overlay

Simplified Room Outlines

Cable Routes and Penetration Points

VO Live signal routes are kept in the buffer spine or dedicated conduits. Video Studio audio stays local to on-set camera / recorder workflow with no fixed signal tie to Control Room. Power and data stay above ceiling before dropping to outlets.

VO Live Buffer Spine Control Room Video Studio Editing Suite SB-01 Control rack AFB1 AFB2 Sub-panel Camera Portable recorder Zoom F6 / MixPre-6 50 mm EMT / 24-pair audio snake Through W6 penetration [AC] W6 [AC] Local XLR to recorder / camera position only Red above-ceiling power, IG circuits separate Blue Cat6A from patch panel to wall plates Camera / recorder stays local in Studio Yellow tally to desk

Route Schedule

Conduit + Cable Count
RoutePathCable / conduit
SB-01 to Control rackVO Live north wall → W6 conduit → buffer spine → rack50 mm EMT / 24-pair orange snake / penetration at W6 [AC]
Studio AFB1 / AFB2Floor boxes → short local run → portable recorder / camera positionOrange local XLR only / no inter-room penetration
Portable field recorderOn set within Video StudioZoom F6 or MixPre-6 / no fixed signal run to Control Room
Sub-panel to outletsAbove ceiling → drops to room outletsRed power / IG circuits labeled separately
Patch panel to data pointsRack patch panel → above ceiling → wall platesBlue Cat6A
TALLY-01Above ceiling → Control deskYellow 4-core control cable

SSOT v3.7: Video Studio operates independently. No fixed signal run to Control Room remains in the routing plan.