SSOT v3.7 · Contractor Detail Drawing · Acoustic Design Basis
Float Floor Build-Up Detail
Float floor assembly for all 4 rooms. Sylomer SR28 pads, twin 18 mm T&G plywood layers, perimeter isolation gap, and room-finish transition are shown as build-critical details.
System
Sylomer SR28 pads
Total Build-Up
150 mm [AC]
Pad Size
150 × 150 mm
Grid
400 mm centers
Drawing 1 — Vertical Cross-Section
150 mm overall build-up [AC]From structural slab to finish floor. Keep the 25 mm perimeter isolation gap continuous around the entire float floor line.
Drawing 2 — Sylomer Pad Plan View
VO Live example · 28 padsExample layout using the VO Live room footprint of 275 × 176 cm. Dashed red border marks the 25 mm perimeter gap. A typical 10 mm column-clearance keep-out zone is shown for coordination even though this example room has no structural column.
Drawing 3 — Perimeter Gap Detail
Critical flanking break [AC]Enlarged detail showing the isolation gap between float floor edge and wall base. This joint must remain flexible and must not be bridged by skirting, screed, or debris.
Failure = flanking path. If screed, skirting, tile adhesive, or debris bridges this joint, the isolation performance of the float floor collapses. Keep the 25 mm gap open until backing rod and Tremco sealant are installed.