Overview
This schedule defines the complete hardware specification for each of the four acoustic doors in the MediaVerse studio complex. All hardware selections are driven by STC requirements and operational needs.
| Component | D1 (Entry) | D2 (Control) | D3 (VO Live) | D4 (Studio) |
|---|---|---|---|---|
| STC Rating | STC 50 | STC 45 | STC 45 | STC 48 |
| Size | 90 × 220 cm | 90 × 220 cm | 80 × 220 cm | 90 × 220 cm |
| Frame gauge | 16 ga steel | 18 ga steel | 18 ga steel | 16 ga steel |
| Hinges | 4× heavy-duty | 3× heavy-duty | 3× heavy-duty | 3× heavy-duty |
| Head/jamb seal | Magnetic + compression | Neoprene compression | Neoprene compression | Magnetic + compression |
| Threshold | Auto drop seal + weather strip | Auto drop seal | Auto drop seal | Auto drop seal |
| Lock | Lever + mortise lock | Lever + passage set | Lever + passage set | Lever + passage set |
| Closer | Concealed overhead, adjustable | Surface mounted | Surface mounted | Concealed overhead |
| Special | Weather stripping (exterior) | — | — | Green Glue in leaf |
D1 — Entry Door
Exterior Entry Door
D1 is the primary entry from the building corridor into the studio complex. As an exterior-facing acoustic door, it requires additional weather protection beyond standard acoustic seals. [AC]
Specification
| Parameter | Value |
|---|---|
| STC rating | STC 50 |
| Leaf size | 90 × 220 cm |
| Frame | 16 ga steel, welded corners, grout-filled |
| Hinges | 4× heavy-duty ball-bearing (120 kg rated each) |
| Perimeter seal | Magnetic strip + compression neoprene gasket [AC] |
| Threshold | Auto drop seal + weather strip gasket [AC] |
| Lock | Lever handle + mortise lock (keyed entry) |
| Closer | Concealed overhead, adjustable closing speed |
Additional Weather Protection
- Weather stripping: Continuous weather strip on all four edges (in addition to acoustic seals) [AC]
- Rain deflector: Aluminium drip bar at door head to prevent water ingress into seal channel
- Threshold gasket: Rubber threshold gasket below drop seal for secondary weather barrier
D2 — Control Room Door
Buffer Spine to Control Room
D2 connects the buffer spine corridor to the Control Room B311. It swings west into the Control Room. [AC]
Specification
| Parameter | Value |
|---|---|
| STC rating | STC 45 |
| Leaf size | 90 × 220 cm |
| Frame | 18 ga steel, welded corners, grout-filled |
| Hinges | 3× heavy-duty ball-bearing (100 kg rated each) |
| Perimeter seal | Neoprene compression gasket (D-profile, continuous) [AC] |
| Threshold | Auto drop seal [AC] |
| Lock | Lever handle + passage set (no key) |
| Closer | Surface mounted, adjustable |
Operational Notes
- Magnetic hold-open: Electromagnetic hold-open device for non-recording use — releases on fire alarm or manual button press
- Swing direction: West into Control Room — does not obstruct buffer spine corridor when open
D3 — VO Live Door
Buffer Spine to VO Live Booth
D3 is the smallest door in the complex at 80 cm width. It connects the buffer spine to the VO Live booth B304. Swings north into the VO booth. This door has the tightest seal requirements in the complex because VO Live targets NC-12. [AC]
Specification
| Parameter | Value |
|---|---|
| STC rating | STC 45 |
| Leaf size | 80 × 220 cm |
| Frame | 18 ga steel, welded corners, grout-filled |
| Hinges | 3× heavy-duty ball-bearing (100 kg rated each) |
| Perimeter seal | Neoprene compression gasket (D-profile, continuous) [AC] |
| Threshold | Auto drop seal [AC] |
| Lock | Lever handle + passage set (no key) |
| Closer | Surface mounted, adjustable |
NC-12 Seal Requirements
- Zero tolerance on gaps: VO Live targets NC-12, which means ANY seal gap is audible in recordings [AC]
- Drop seal verification: Must contact threshold across full 80 cm width with zero daylight [HP]
- Compression gasket: Verify positive compression on head and both jambs with feeler gauge (no 0.5 mm gap acceptable) [HP]
D4 — Video Studio Door
Buffer Spine to Video Studio
D4 serves the Video Studio B312-1. It is upgraded to STC 48 to match Wall 7 performance and includes Green Glue constrained layer damping in the leaf construction. [AC]
Specification
| Parameter | Value |
|---|---|
| STC rating | STC 48 |
| Leaf size | 90 × 220 cm |
| Frame | 16 ga steel, welded corners, grout-filled |
| Hinges | 3× heavy-duty ball-bearing (100 kg rated each) |
| Perimeter seal | Magnetic strip + compression double seal [AC] |
| Threshold | Auto drop seal [AC] |
| Lock | Lever handle + passage set (no key) |
| Closer | Concealed overhead, adjustable |
Green Glue CLD Construction
- Application: Green Glue applied between the MDF stiffener layers inside the door leaf [AC]
- Coverage: 2 tubes (828 mL each) per m² of MDF surface
- Cure time: 30 days to full damping performance
- Purpose: Converts vibrational energy to heat through constrained layer damping, adding 2–3 STC points over the base STC 45 construction
Maintenance Schedule
Preventive Maintenance for All Acoustic Doors
| Frequency | Task | Acceptance Criteria |
|---|---|---|
| Annual | Inspect all seals for compression set, cracking, or gaps | No light visible around any edge when door is closed. Replace seals if light is visible. [HP] |
| Annual | Verify drop seal contact with threshold | Full-width contact with threshold plate. Adjust mechanism if gap exists. [HP] |
| Bi-annual | Lubricate hinges; check closer speed | Closer speed: 3–5 seconds from 90° to latch. No hinge binding or squeaking. |
| As needed | Check magnetic seal pull force (D1 and D4 only) | Minimum pull force: >2 kg/m of seal length. [AC] |