Stagebox & Signal Conduit Details
Signal infrastructure keeps the essential SB-01 VO Live link in Wall 6 while Video Studio now operates independently with local floor-box / recorder workflow only. Stagebox, conduit sleeve, tray routing, and the Control Room rack landing are documented here for electrical and AV coordination.
Drawing 1 — SB-01 Face Plate
Center at 90 cm AFFFront elevation of the Control Room stagebox faceplate with balanced audio and utility terminations grouped by function.
Drawing 2 — Conduit Through W6
Both faces sealed [AC]Signal conduit crossing W6 uses a 50 mm EMT sleeve with a 10 mm annular gap and Tremco Fyre-Sil on both wall faces.
Drawing 3 — Cable Tray in Buffer Spine
SB-01 southbound + local Studio servicesA 150 mm wide tray rises through the buffer spine and separates the southbound SB-01 bundle from local Studio floor-box services only. No northbound Video Studio stagebox run exists in SSOT v3.7.
Drawing 4 — Control Room Rack Layout
Apollo x4 landingThe Control Room rack receives the SB-01 bundle at the bottom and lands the patching hardware directly above the interface position for short analog tie lines.