7 wall assemblies with layer-by-layer construction details. All STC ratings and layer stacks from SSOT.
| STC Rating | 65 |
| Field STC Est. | 58–62 |
| Treatment Depth | 10 cm |
| Total Layers | 6 |
Concrete mass + resilient clips; field loss from penetrations and edge sealing
| STC Rating | 65 |
| Field STC Est. | 58–62 |
| Treatment Depth | 10 cm |
| Total Layers | 6 |
Concrete mass + resilient clips; angled geometry improves diffusion but complicates edge sealing
| STC Rating | 62 |
| Field STC Est. | 55–59 |
| Treatment Depth | 16 cm |
| Total Layers | 4 |
Decoupled stud + existing air gap; server-side vibration may reduce performance
| STC Rating | 50 |
| Field STC Est. | 44–48 |
| Treatment Depth | 15 cm |
| Total Layers | 5 |
Green Glue CLD on both faces is required [AC]; D1 exterior door is still the weakest link in this wall.
| STC Rating | 55 |
| Field STC Est. | 49–53 |
| Treatment Depth | 15 cm |
| Total Layers | 5 |
Green Glue CLD improves mid-frequency; duct penetrations must be fully sealed
| STC Rating | 53 |
| Field STC Est. | 47–51 |
| Treatment Depth | 12 cm |
| Total Layers | 3 |
Staggered-stud partition with no Green Glue; observation window remains the weakest element and composite STC depends on seal integrity.
| STC Rating | 48 UPGRADED |
| Field STC Est. | 43–46 |
| Treatment Depth | 11 cm |
| Total Layers | 4 |
Upgraded from legacy STC40 to STC 48 (SSOT v3.7). Green Glue is required on the studio side only [AC] and is critical for mid-frequency isolation.