Buffer Spine
W5 — STC 55 — The acoustic heart of the facility
Overview
| Parameter | Value |
|---|---|
| Name | Buffer Spine |
| West face X | 213.6 cm |
| East face X | 228.6 cm |
| Thickness | 15 cm |
| Wall type | W5 (STC 55, field 49–53) |
Purpose
Acoustic separation between the west zone (VO Live + Control Room) and the east zone (Video Studio + Editing Suite).
HVAC routing — the ONLY permitted duct routing path between zones. All 5 silencer runs route through the buffer spine.
Circulation corridor via D2 (Control access, STC 45) and D4 (Studio/Editing access, STC 48).
This is not just a corridor wall — it is the core of the isolation strategy between the two most critical zones.
Wall Assembly W5
2×12.5mm gyp+GG (west face)
100mm steel studs + Rockwool infill
2×12.5mm gyp+GG (east face)
Lab STC: 55 | Field STC: 49–53
HVAC Routing Through Buffer
| Run | Length | Attenuation | Serves |
|---|---|---|---|
| Run A | 1500mm | 40dB | VO Live (IDU-04) |
| Run B | 1000mm | 25dB | Trunk (splits to B1+B2) |
| Run B1 | 500mm | 15dB | Control branch (IDU-03) |
| Run B2 | 300mm | 10dB | Editing branch (IDU-03) |
| Run C | 1000mm | 25dB | Video Studio (IDU-05) |
Main trunk B (1000mm/25dB) splits at a wye fitting into B1 (Control) and B2 (Editing). All 5 runs are shown separately — B1 and B2 are never collapsed into a single entry.
Column Detail [AC]
| Parameter | Value |
|---|---|
| Column | COL_W |
| Dimensions | 60 × 50 cm |
| Position | (369.1, 140.6) |
| Air gap | 10mm [AC] |
| Detail required | Box-out detail for duct routing around column |
Door Access
| Door | STC | Location | Connects |
|---|---|---|---|
| D2 | 45 | Buffer west face | Control Room access |
| D4 | 48 | Studio/Editing partition | Studio ↔ Editing |
Buffer Footprint
Design Constraints [AC]
- [AC] COL_W at (369.1, 140.6) — 10mm air gap must be maintained, box-out detail required
- [AC] All 5 silencer runs must route through buffer spine — no alternative paths
- [AC] Duct penetrations through W5 must be sealed with acoustic sealant
- Buffer spine is the ONLY permitted HVAC routing path between zones