Video Studio

B312-1 — Video production — The largest room in the facility

Use Cases

Video production, podcast with camera, green screen shoots, product demos. The largest room at 11.23 m² with a 3.60m camera throw distance.

Room Data

ParameterValue
Room codeB312-1
Width490 cm [AC]
Depth229 cm
Area11.23 m²
Volume30.88 m³
Ceiling AFF275 cm (80% Rockfon Sonar E) (80% = 8.98 m² of 11.23 m² floor area, full ceiling except perimeter 300mm strip)
FlooringVinyl
NC targetNC-18
RT60 achieved0.25s
Schroeder freq180 Hz
IDUIDU-05 (dedicated)

Floor Plan Position

Video Studio occupies the northeast section of the zone, east of the buffer spine. Width is 490 cm (NEVER 498 or 500) — this is a locked SSOT value.

Room Footprint

490 cm 490 cm 229 cm D4 Video Studio B312-1 · 11.23 m² N

Acoustic Treatment

ElementQtySpecification
Absorption panels13Rockwool RWA45 50mm, 1200×600mm, NRC 0.90
Bass traps4All 4 corners
QRD diffusers2South wall lower center
Ceiling80%Rockfon Sonar E, NRC 0.90

2 additional panels added per ISM simulation verification (pyroomacoustics) — target 0.25s requires 13 panels minimum.

Camera Setup

ParameterValue
Camera throw3.60 m (measured along east-west axis, room width 4.90m)
Green screenEast wall — motorized roller, ceiling-mounted housing
Camera positionWest wall, shooting east toward green screen
East wall panelsNONE — green screen wall, no absorption panels
Green screen power outletST-GS: east wall, exactly 265cm AFF [AC]

RT60 Analysis

BandTarget (s)Achieved (s)Status
125 Hz0.400.38✓ Pass
250 Hz0.320.33✓ Pass
500 Hz0.270.28✓ Pass
1 kHz0.250.26✓ Pass
2 kHz0.250.25✓ Pass
4 kHz0.270.24✓ Pass

Target = 0.25s at 500-1000 Hz midband

13 panels required to meet target (ISM verified)

Room Modes

ModeFrequency
Length (L)35.0 Hz
Width (W)74.9 Hz
Height (H)62.4 Hz
Schroeder180 Hz

Noise Criteria

Target: NC-18

Octave (Hz)631252505001k2k4k8k
NC-18 limit (dB)5444373127242221

Boundary Build-ups

WallTypeLab STCFieldAssembly
North perimeterConcrete6558–62300mm concrete + RSIC-1 + 50mm RW + 2×gyp
South (W7)Partition4842–46Studio/Editing partition
East perimeterConcrete6558–62300mm concrete + RSIC-1
West (W5)Buffer spine5549–532×12.5mm gyp+GG + 100mm studs+RW + 2×12.5mm gyp+GG
CeilingRockfon Sonar E80% coverage, NRC 0.90, 275cm AFF
FloorFloatVinyl finish + 15cm Sylomer buildup

HVAC

ParameterValue
IDUIDU-05 (dedicated)
SilencerRun C: 1000mm, 25dB, 2.0 m/s, NC-18

Design Constraints [AC]

  • [AC] Studio width is 490 cm — NEVER 498 or 500
  • [AC] Green screen power outlet ST-GS must be at exactly 265cm AFF on east wall
  • 13 absorption panels required to meet RT60 target (ISM verified)
  • Camera throw 3.60m determines furniture layout